Expertise in electromechanics, machinery and quality assurance
Machine damage, breakdowns, underperformance and warranty disputes: establishing the cause while preserving the evidence
By preserving the evidence before anyone touches it, and then ruling things out systematically: rating plate and maintenance history, fault codes from the on-board computer, manufacturer's instructions, work orders and, where necessary, dismantling according to a protocol communicated in advance. A machine that has already been repaired or started after the damage has usually lost its story.
Who is it for
Industrial companies, contractors and equipment hire firms with damage to a machine, a piece of equipment or an installation, and a discussion about cause, repair and liability.
Manufacturers, suppliers and repairers who want to show that a component was compliant or that damage results from use or maintenance.
Insurers, lawyers and courts who need a technically substantiated finding, with the evidence preserved and the adversarial principle respected.
How it works
- Preserving the evidence. Before the first inspection: no repairs, no dismantling, no moving, no starting. Photographs in original format with metadata. Telematics and on-board computer read out in the presence of all parties, and quickly, because that data is only kept for a limited time.
- Identification. Rating plate, serial number, running hours, maintenance sticker, manufacturer's manual and repair instructions. Without that basis, no quotation can be checked.
- History and contract. Work orders, maintenance contract, warranty terms, telemetry and alarm history over the entire service life, where available.
- Technical analysis. Reconstructing the damage mechanism, separating damage from the incident from wear and earlier damage, checking the repair quotation item by item against the manual, and deriving the repair time.
- Dismantling or laboratory where necessary. According to a protocol communicated in advance, jointly, photographed, with the parts kept available until they are released.
- Report. Cause, each party's share from a technical point of view, repair estimate and repair time.
What you can expect from us
Discipline around the evidence. The core of every machine investigation is what has not yet been touched. At the first meeting we record what remains untouched, and we hold the parties to it.
Knowledge of machines and of the rules around them. From planetary gearboxes and winches to gas engines, exhaust after-treatment and the European rules on how an engine must behave in the event of a fault.
Data as a witness. Telemetry over years, alarm history, availability calculations using the contract formula rather than an average. Where an opposing party puts forward a theory, we test it against the installation's own data.
Quotations that add up. A repair quotation that bundles all labour into one item, or names a part without pricing it, is not accepted until it has been broken down.
Costs
An hourly rate for file review, site visit, analysis and report, plus travel costs and the cost of manufacturer documentation, laboratory work or dismantling by third parties, excluding VAT. An estimate in hours in advance; in the case of a court appointment, in accordance with the rules on the advance on costs and the deposit with the court registry.
Standards and legislation
- Manufacturer's manuals, repair instructions and maintenance schedules: often the first benchmark in machinery disputes.
- Delegated Regulation (EU) 2017/654, Annex IV: the mandatory limp-home behaviour of engines in the event of a fault in the exhaust after-treatment system (SCR/AdBlue), with torque and engine speed limitation.
- Maintenance and warranty contracts: availability guarantees, notification periods, reporting obligations, operating conditions.
- Kelvin TOP-SET for incident and root cause investigation; sector-specific quality systems for quality assurance.
- Belgian Judicial Code, Article 962 et seq., in the case of a court appointment.
We do not start the machine: a single attempt to start it can erase the fault codes that prove the cause.
ir. Ben Verlinden
Questions about industry
What is a root cause analysis?
A structured investigation that separates the actual cause of a breakdown or incident from the symptoms and the incidental circumstances: gathering facts, building a timeline, testing hypotheses against data and manufacturer's instructions, and only then drawing conclusions. We use the TOP-SET method for this, the same one used for incident investigation in the process industry.
Can you investigate an installation while it is in operation?
Yes, if safety permits and the parties are aware of it. We read out telemetry, alarm history and logs while the installation is running; for dismantling or destructive testing we agree a protocol with all parties, so that every step takes place jointly and is photographed.
How do you deal with warranty disputes?
By setting the contract and the manufacturer's instructions against the facts: what was guaranteed, which maintenance and operating conditions applied, and were they complied with. A maintenance interval that was exceeded, or a part that had already been replaced without a joint inspection, changes the outcome completely.
What role does maintenance play in liability?
A large one. Maintenance contracts impose obligations on both sides: preventive and corrective maintenance, notification periods, reporting, availability guarantees, but also the operating conditions the operator must ensure. We test them clause by clause and set the work orders alongside.
Do you work with laboratories?
Yes, for materials testing, fracture analysis, corrosion and oils. We brief the laboratory, put the questions to the parties in advance together with the estimated cost, and translate the laboratory report into what it means for the dispute.
Related
Discuss your case
A first conversation is free of obligation. Book a time straight away, or send us your question through the form.
Last updated: